TRAD Safety Systems Ltd

Please download Flash player.

Installation Guide



TWO MAN OPERATION

Stage 4

Stand frame up and move into position on the roof with one man at each end, making sure that operatives are behind the assembly and that a completed handrail height of 1.1 metres has been achieved Once in position, man (1) holds frame. Man (2) fits counterweight and radial arm into the required legs. Once fitted fasten the T keys on rear of legs. Then whilst standing behind the erected guardrail frame insert sleeves coupler onto tube ends for continuation of handrail.